Six Factors Influencing the Price
1. Materials and Craftsmanship
Surface materials, elastic layer materials, environmental protection, and antibacterial treatment processes directly affect costs.
2. Cushioning Tier (1A/2A/3A)
The stronger the cushioning, the more materials used and the more complex the process, meaning higher tiers generally incur higher costs.
3. Anti-slip Rating
The R10 rating required for wet areas and structures such as Xingji drainage will increase costs.
4. Thickness
Greater thickness usually means more cushioning and material.
5. Area
Whole house vs. key areas shows a difference in total price; zoning configurations can help manage the budget.
6. Installation Method and Site Conditions
Modular vs. wall-to-wall installation, whether the original subfloor needs preparation, transportation, installation, etc.
How to Budget Rationally?
- First define thekey areas(bathroom, bedside) to reduce risks, then expand according to the budget.
- Select tiers by zone: use higher-tier products in high-risk zones and basic-tier products in low-risk zones.
- Provide the scenario, area, and client conditions to the supplier, and get atailored solutionrather than simply comparing unit prices.
Retail prices are not publicly listed on the official website. We recommend submitting the area, scenario, subfloor, and edging conditions via phone or WeChat to receive a quote and sample arrangements from sales based on the project configuration.
